In my experience, tutoring for test preparation tends to be more goal-oriented and standardized where I'm leading lessons and reviewing material with a focus on helping the student to pass the test. In general tutoring, the goal may be to help the student improve their grades or get into a more advanced course, which can make lessons vary more widely. Test-prep tutoring also makes assessing students easier because I can provide them with approved study questions and practice exams that mimic the actual test. Plus, we can calculate the exam results right after the student finishes and see what progress has been made and where the student still needs to improve.
I then go over the agenda for the session so that they know what to expect. I also typically give them a brief quiz to go over the previous sessions' topics and see what they remember and or where they may need additional work. After the review, I try to connect how those previous topics relate to what we're going over in the current session. I go through the lesson, which typically involves the student reading material aloud and discussing the prompts with me. Finally, I leave at least five minutes at the end of the session for any additional questions about the material."
Subjects
-
English Expert
-
Science Expert
-
Tamil Expert
-
Malay Expert
-
Pendidikan Moral Expert
Experience
-
process integration engineer (Jan, 2022
–Present) at infineon technologies kulim malaysia
Working on C5SOI Technology Gate Driver
-
engineer (Oct, 2020
–Dec, 2021) at SilTerra Malaysia
Worked under MRAM-TMR Transfer Project
1.Monitoring and improving process stability using Statistical process control (SPC) tool to ensure quick detection of deviation and containment of inline equipment or testing issue.
2.Implement process improvement plan based on SPC, failure mode effect analysis (FMEA), Control Plan and Yield data for process changes and tool qualifications.
3.Key member in performing root cause analysis and implementation of corrective and preventive action for customer complaints and product failures.
4.Monitor and maintain device performance by verifying E-test, WAT,inline measurement data and also failure analysis such as ILM Scan, Cross Sem,TEM.
5.Plan and conduct for new tape out device by preparing engineering run sheet based on customer process specifications.
Education
-
Master in Material Engineering (Oct, 2021–now) from University science malaysia–scored 3.65
-
Bachelor in Material Science (Aug, 2016–Oct, 2020) from university Putra Malaysia, Kuala Lumpur–scored 3.62