Lead Civil Structural Engineer (Jun, 2014
–Apr, 2020) at China petroleum Engineering, Dubai
Experience
Review and checking of Deliverable Documents includes Design basis, Specifications, Design Calculations, Drawings including attending Site support, interdisciplinary coordination and PDS modelling activities.
Interface with EPC Contractor and Site, to prioritize necessary Civil Structural deliverables to meet construction work front requirements.
Ensure that throughout project Company Standards and Quality procedures are followed.
Coordination with Client-Onshore, to get necessary approvals for Civil Structural deliverables
Implement suitable solutions where ever unforeseen challenges arises particularly brown field work areas.
Delivered Construction work front around 120000 Cum concrete and 14000 MT of structural steel for the Construction, meeting with accelerated project and construction schedules.
Project Name (Recent) : BAB Integrated Facilities Project(BIFP), UAE
Name of the client : ADNOC Onshore, Abu Dhabi, UAE
Project Cost (USD) : 1.3 Billion USD
Position : Lead Civil Structural Engineer
Project profile:
This project is EPC of BAB project consisting of Central Degassing Station (CDS) / Remoted dewatering stations(RDS) (9 Areas), Pads(4)/Minipads(11)/WellBays(11)/WIC’s(4)/Offpad wells(58).
Project Name : Replacement of Three Phase test separators project, Dukhan, Qatar
Name of the client : Qatar Petroleum, QATAR
Project profile:
Performing Civil Structural detailed engineering for the replacement of Old Test Sepeartors with new 3 Phse test separators at all Degassing station locations in Dukhan area, Qatar.
Project Name : Provision of EPCC for Source water Plant 1(SWP1) Expansion, Iraq
Name of the client : Petro china, Iraq
Project profile:
This project is for Supply of Clean water to entire Halfaya oil field process plants by taking River water through river intake structure and sending to Water Treatment Plant.
Project Name : Oil Gathering Facilities (OGF Phase-1., Offsite-3),Garraf Development., Iraq
Name of the client : Petronas (PCIHBV), Iraq
Project profile:
The scope of this project consider the development of Wellpad facilities WP-C, D and J which consists of new production wells and tie-in to the existing facilities at Wellpad A, Wellpad F and GIFT.
Project Name : Early Civil Works, Oil Gathering Facilities,Garraf Development., Iraq
Name of the client : PETRONAS Carigali Iraq Holding B.V.(PCIHBV). (PCIHBV), Iraq
Project profile:
This project is Early Civil Work Phase 1A of existing Wellpad Q expansion for additional three (3) slots, new Wellpad J for twenty eight (28) well slots and new Wellpad C for twenty eight (28) slots