I select a location in which the building is located by using HAP (Hourly Analysis Program) software which is based on the heating and ventilation principle and calculate the cooling load. The air Conditioning is Designed while using the central cooling coil. I also consider humidity level and other specified characteristics. Its Presentation is also available.
No reviews yet.