Primavera P6 tutors in Seeduwa

  • Premaratne Soil Mechanic, Structural Design, AutoCAD

"I am a Chartered Civil Engineer with over 23 years of experience in the construction industry, as well as a passionate educator in AutoCAD and Structural Design. I have trained more than 2,000 AutoCAD draftsmen globally and guided engineers toward obtaining their chartered status. My online lectures include practical assignments, which I discuss...

  • Colombo
  • රු2,0005,000/hour
  • 10.0 yr.
  • 23.0 yr.

Locations

Online