Primavera P6 tutors in Nedurupitiya

"I am a Chartered Civil Engineer with over 23 years of experience in the construction industry, as well as a passionate educator in AutoCAD and Structural Design. I have trained more than 2,000 AutoCAD draftsmen globally and guided engineers toward obtaining their chartered status. My online lectures include practical assignments, which I discuss...

  • Colombo
  • රු2,0005,000/hour
  • 10.0 yr.
  • 23.0 yr.

I am an accomplished educator with extensive expertise in Quantity Surveying (QS), Mechanical, Electrical, and Plumbing (MEP) QS, and Building Information Modeling (BIM). With a strong foundation in both practical and theoretical aspects of the construction industry, I bring valuable insights to the classroom, ensuring students are well-prepared...

  • Pittugala
  • රු1,5003,000/hour
  • 2.0 yr.
  • 2.0 yr.

Experienced Civil Engineer with Expertise in Project Management and Planning
Highly skilled and accomplished Civil Engineer with over 24 years of experience in the construction industry. Specializing in high-rise building construction, hotels, roads, and infrastructure projects. Possesses an M.Sc. in Project Management and exceptional knowledge...

  • Pannipitiya
  • රු2,50010,000/hour
  • 2.0 yr.
  • 2.0 yr.

Locations

Online