Primavera P6 tutors in Al Fardoos City, First 6th of October

Simple way to understand the topics. In addition, many excercises solved and dicussed with the assignment and homework solution. Weekly quizzes with their model answers with many aolved question bank for the variety of ideas and widen the horizon to solve any other type of problems.
Available at anytime on Whatsapp or any other way of...

  • Giza
  • £400600/hour
  • 1.0 yr.
  • 2.0 yr.

Hello Everyone, I am a postgraduate student in Mechanical engineering. I have bachelor of Engineering in Industrial and Production engineering. I've been teaching Industrial Engineering and PMP courses for more than 4 years.
I have Digital pen and an Online whiteboard, so I can share Screen online with you.
The following is the number of...

  • Cairo
  • £6001,500/hour
  • 4.0 yr.
  • 4.0 yr.

Locations

Online