Online Primavera P6 tutors in Street 06, Islamabad

I am Highly experienced MEP CAD / Estimation Engineer with 16 years of experience in Preparing accurate MEP Shop Drawings, Quantity take-offs, As-built drawings, and Billing Documents for various projects, including Multi-story Hotels, Hospitals, Residential & Commercial Buildings, and Bus Rapid Transit System Projects. I am Teaching Since 2021 On...

  • G-14/1
  • Rs5,0009,500/month
  • 5.0 yr.
  • 5.0 yr.

Experienced Civil Engineer with a strong foundation in construction, design, and project management, proficient in utilizing advanced software tools to deliver high-quality results. With expertise in AutoCAD 2D & 3D, Revit Architecture, Quantity Surveying, Estimation, and Primavera P6, I am skilled in managing diverse aspects of civil engineering...

  • Multi Gardens B-17
  • Rs1,0001,500/hour
  • 3.0 yr.
  • 6.0 yr.

Dedicated, resourceful and goal-driven professional educator with a solid commitment to the social and academic growth and development of every student.
An accommodating and versatile individual with the talent to develop inspiring hands-on lessons that will capture a child's imagination and breed success.
Highly motivated, enthusiastic and...

  • Rawalpindi
  • Rs2,5007,000/hour
  • 4.0 yr.
  • 4.0 yr.

I am a graduate mechanical engineer with 40 years of experience in project management, quality control, training, and business analysis.

I am certified in:

1. PMP (Project Management Professional)
2. PMI-RMP (Risk Management Professional
3. CBAP (Certified Business Analysis Professional)
4. PRINCE2
5. Six Sigma Black Belt

I have...

  • Rawalpindi
  • Rs3,000100,000/hour
  • 11.0 yr.
  • 30.0 yr.
  • 1000 km

Greetings,
It’s a pleasure to connect with you guys here on this platform. I have worked on different projects involving Geotechnical, structure, steel structure, autocad, mechanics of fluids etc. Any student can reach out to me regarding any kind of issue they are facing. We should work together to make you a skill full and competent person....

  • Phase 8
  • Rs500/hour
  • 1.0 yr.
  • 2.0 yr.
  • 5 km

Hello! I'm Syed Affan Ahmad, a passionate and dedicated math tutor with a background in civil engineering with a passion for helping science students from grades 1 to 10 excel in mathematics. With 3+ years of experience, I have honed my teaching methodologies to cater diverse learning styles and ensure student success.

**Methodologies and...

  • Street 15
  • Rs1,5002,000/hour
  • 0.0 yr.
  • 3.0 yr.

Locations

Online