Primavera P6 assignment tutors in Thalawathugoda East

Experienced Civil Engineer with Expertise in Project Management and Planning
Highly skilled and accomplished Civil Engineer with over 24 years of experience in the construction industry. Specializing in high-rise building construction, hotels, roads, and infrastructure projects. Possesses an M.Sc. in Project Management and exceptional knowledge...

  • Pannipitiya
  • රු2,50010,000/hour
  • 2.0 yr.
  • 2.0 yr.

I am an accomplished educator with extensive expertise in Quantity Surveying (QS), Mechanical, Electrical, and Plumbing (MEP) QS, and Building Information Modeling (BIM). With a strong foundation in both practical and theoretical aspects of the construction industry, I bring valuable insights to the classroom, ensuring students are well-prepared...

  • Pittugala
  • රු1,5003,000/hour
  • 2.0 yr.
  • 2.0 yr.

"I am a Chartered Civil Engineer with over 23 years of experience in the construction industry, as well as a passionate educator in AutoCAD and Structural Design. I have trained more than 2,000 AutoCAD draftsmen globally and guided engineers toward obtaining their chartered status. My online lectures include practical assignments, which I discuss...

  • Colombo
  • රු2,0005,000/hour
  • 10.0 yr.
  • 23.0 yr.

Locations

Online